After the crew took all of last week off they are finally back at work. As of this afternoon...
all of the framing has had the insulation installed.
just about all of the framing has been sheet-rocked.
the lining for the shower is being tested for leaks.
and their is a "pretty" hole for the toilet (or so I've been informed by my sister).
Pictures to follow today or tomorrow.
Let's pray for being able to paint next weekend. And choosing floor coloring, wall color, cabinet style, and cabinet stain color before next weekend.
No comments:
Post a Comment